The roof renovation of the Binnenpret has finished some weeks ago. We’re still waiting for the new roof window to be placed but all the major (leak causing work) has been done. So we’ve looked at the damage and started fixing the place up.

The estimated damage is around 300/400 euro. We have to replace 15m2 of the floor, the back wall, and some pieces of walls in the back that got “infected” with fungus. Fortunatelly the Binnen Pret collective decided to pay the costs for materials so at least we don’t run into the debt.

For last two weeks we’ve been busy fixing the walls. All the wood/plaster with fungus were removed and the whole back area (including the floor) has been treated with bleach and special anti-fungus stuff (more bleach).

Last week we’ve replaced all the missing wood and plasterboards and started plastering so everything would be nice and even.

Below you can see the planning for coming weeks so if you have time and feel like helping out please do so:

  • 16th January (Thursday) from 19:00-23:00  – Finishing with plaster
  • 17th 18th January (Friday) – 19:00 – 22:00 Painting walls
  • 18th 23rd January (Saturday) 14:00 – 22:00 – Placing new floor, cleaning up the place, moving stuff back into place
  • 25th, 30th  January (Thursdays from 19:00 Saturdays from 14:00)- More cleaning, rearranging, painting making the place look awesome etc.
  • 1st February (Saturday) from 14:00 – 23:00  – We are up and running again \o/